Engineering License (NEC) MCQ Questions with Answers – Practice Set 2
Read Exam GuideYou can take this quiz as a guest. Log in first if you want it saved to your progress history.
Answer Key & Explanations
-
According to standard codes of engineering ethics, when a project requirement conflicts with public safety, an engineer should primarily...
Correct answer: Hold public safety, health, and welfare as paramount, even above client instructions
Codes of engineering ethics consistently state that engineers must hold the safety, health, and welfare of the public paramount, above the wishes of a client or employer.
-
The Nepal Engineering Council (NEC) was established under which legal instrument?
Correct answer: The Nepal Engineering Council Act, 2055 B.S. (1999 A.D.)
NEC was created under the Nepal Engineering Council Act, 2055 B.S. (1999 A.D.), which empowers it to regulate the engineering profession and grant licenses.
-
Which part of the Nepal National Building Code (NBC) specifically addresses seismic design of buildings?
Correct answer: NBC 105
NBC 105 is the code provision dealing with seismic design requirements for buildings in Nepal, an earthquake-prone country.
-
What is the main purpose of the 'Mandatory Rules of Thumb' (MRT) provisions in Nepal's building codes?
Correct answer: To provide simplified, prescriptive guidelines for low-rise buildings so they can be built safely without full structural analysis
The Mandatory Rules of Thumb give simplified, prescriptive design and construction guidance for smaller, low-rise buildings where full detailed structural engineering analysis may not be undertaken, helping ensure basic seismic and structural safety.
-
In structural engineering, the 'factor of safety' is best described as...
Correct answer: A ratio comparing a material's ultimate or yield strength to the actual working stress it will experience, to account for uncertainties
Factor of safety accounts for uncertainties in loading, material properties, and workmanship by ensuring the working stress is kept well below the material's failure strength.
-
The slump test performed on fresh concrete is used to measure...
Correct answer: The workability (consistency) of fresh concrete
The slump test is a simple field test that indicates the workability or consistency of freshly mixed concrete, not its final strength.
-
Generally, reducing the water-cement ratio in a concrete mix (while keeping other factors constant) tends to...
Correct answer: Increase strength but reduce workability
A lower water-cement ratio generally produces denser, stronger concrete, but it also makes the mix less workable and harder to place and compact.
-
Why is continuing professional development (CPD) emphasized for licensed engineers?
Correct answer: To help ensure engineers keep their knowledge and skills updated with evolving codes, technology, and practices
CPD helps licensed professionals stay current with new codes, technologies, and best practices, supporting their ongoing competence to protect public safety.
-
If an engineer identifies a personal or financial conflict of interest on a project, professional ethics require that they...
Correct answer: Disclose it to the relevant parties, such as the client or employer
Codes of ethics require engineers to proactively disclose conflicts of interest so that clients and employers can make informed decisions.
-
In Nepal, certain infrastructure and development projects are legally required to undergo an Initial Environmental Examination (IEE) or Environmental Impact Assessment (EIA) primarily to...
Correct answer: Assess and mitigate the project's potential environmental impacts before implementation
IEE and EIA processes are environmental safeguards used to evaluate and minimize the potential negative environmental effects of development projects before they proceed.
